SouVR.com>Software>VR Software>Bentley

    Integrated Solution for the Production of Driller’s Logs

    • Brand:
    • Hits:
    • User Ratings:(0)
    The easy to follow formats guide the engineer or driller through the logging process and compliant formats can be used to enable on-site production and printing of sample labels.

    Contact us:

    TEL: +086-010-50951355 / FAX:+86-010-50951352

    Email : cathy@souvr.com / Frank@souvr.com / Robin@souvr.com / sales@souvr.com

    • Details

    • Related

    • Consulting

    ※Product Overview※

    Integrated Solution for the Production of Driller’s Logs

    KeyLogbook provides a simple integrated solution for producing fully compliant borehole logs. It ensures the capture of essential data at source and eliminates the double handling of data, saving time and reducing risk of errors. The easy to follow formats guide the engineer or driller through the logging process and compliant formats can be used to enable on-site production and printing of sample labels.


    CAPABILITIES

    Data Uploaded in Real Time
    Each device can be set to synchronize with our Enterprise Cloud at each set time period and when the hole or shift is completed. Team members with access can then preview draft investigation data in real time or at the start of each day.


    Digital Drilling Requests

    Requests can be created in HoleBASE Enterprise and synced with the driller’s or engineer’s device, creating an audit trail and ensuring that the driller uses the project’s referencing system.


    Flexible Data Entry Profiles

    Data entry profiles can be set up in our Enterprise Cloud and synchronized to every device. Each profile is fully customizable, so your team can log to company standards with simple user specified customization


    Reduce Error with Validation Checks

    Data is checked as it is entered using validation checks that can be set up and modified by the administrator. A data completeness check is also run during the entry of each item and when the hole is completed.


    Save Time with Data Validation

    Missing, or incorrect, data can cause significant delays to a project. Data is checked on entry using validation checks that can be set up and modified by the administrator. A data completeness check is also run during the entry of each item and when the hole is completed.

    Welcome to consult us!

    Consulting type:
    Consulting content:
    more>>

    Brand Zone

    • Haption(0)
    • Patchwork3d(0)
    • Xsens(0)
    • Manus(0)
    • ART(0)
    • CyberGlove(0)
    • DGTech(0)
    • 5DT(0)
    • Ascension(0)
    • NDI(0)
    • Polhemus(0)
    • EON(0)
    • Vuzix(0)
    • More3d(0)
    • Volfoni(0)
    • VRLogic(0)
    • zSpace(0)
    • Exceptional3D(0)
    • SuperD(0)
    • Alioscopy(0)
    • Realis(0)
    • Qualisys(0)
    • CRNT(0)
    • Nokov(0)
    • Miracube(0)
    • 3Dsystems(0)
    • STEP(0)
    • 甲尚科技(0)
    • TechViz(0)
    • Middlevr(0)